|
This guide is an example that WD102-flow indicator is installed in 120TX water cooling kit.
Open the packaging of flow indicator, you will see these accessories: power line (directly tie-in 4 P when install at the computer), two barbs, two tubing clips, a indicator with two LED lihgts. There need a special connecting line (demand buy separately) when the flow indicator is installed in 120TX water cooling kit.

Make two LED lights insert into the both ends of the indicator, as shown below

Twist two barbs to the ends of the indicator, must be tighten, or it may be leak.

Search for a suitable location at the water cooling tubing, estimate how long tubing should be cut off

Use scissors to cut the tubing

Ring the tubing clips at the tubing, then insert tubing into the barbs at the both ends and fix by the tubing clips

Open the top of 120TX box, connect the connecting line to power supply, pull out a fan’joint from original electrical outlet and insert the connecting line, the other joint of the connecting line should connect the power of flow indicator, then electrify

Turn off the lights around and look, it's beautiful.

Look at the overall effect.

Shijiazhuang Dongyuan Cooling Technology Co.,ltd
Provenance: http://www.ysun.net/news_detail.php?id=99
|